Please enable JavaScript to view this site.

QPR Knowledge Base 2025.1

Navigation: Introduction to New Features > QPR Metrics

Next Period's Value Is No Longer Put Into Current Period When Next Period Doesn't Exist for Measure (D-14111)

Scroll Prev Top Next More

When inputting values for a measure in QPR Portal analysis or navigator views, if the Next or Previous period was selected but didn't exist, the value was placed into the Current period instead. This is now prevented.