QPR Knowledge Base 2017.1

Measures Dialog

 

Measures Dialog

 

Previous topic Next topic No directory for this topic  

Measures Dialog

 

Previous topic Next topic Topic directory requires JavaScript Mail us feedback on this topic!  

Measures are created, modified and deleted using the "Measures" dialog. This dialog is accessed from the Model tab of the ribbon by selecting Model Elements arrow_right Measures. The Measures dialog displays a list of all the measures available in the model.

 

dlg_measures

Measures dialog

 

 

Creating a New Measure

New measures can be created for use in measuring and analyzing the process.

 

A new measure is created in the Measures dialog by clicking the New button. It is also possible to create a new measure from the analysis window by selecting [New measure] from the measure drop down list. A Measure dialog is shown for setting the properties.

 

 

Modifying a Measure

A measure can be modified using the Measure dialog. To access this dialog, press the View button.

 

note

Note

Notice that if you change value type or format of a measure, for which there already exists values in the model, these values are converted according to new measure properties! This can cause lost or corrupted measure values!

 

 

Deleting a Measure

A measure is deleted by selecting it from the list box in Measures dialog and clicking Delete button. Before deleting, a confirmation dialog will appear asking you to confirm that you wish to delete the measure.

 

note

Note

If you delete a measure, all of its values are deleted along with it!